全部 |
  • 全部
  • 题名
  • 作者
  • 机构
  • 关键词
  • NSTL主题词
  • 摘要
检索 二次检索 AI检索
外文文献 中文文献
筛选条件:

1. "Here comes the sun": Determinants of solar farm planning at local authority level in England NSTL国家科技图书文献中心

Muhammad Mohsin Huss... |  Costanza Concetti... -  《Energy Research & Social Science》 - 2025,120 - 103916~ - 共12页

摘要: factors influencing whether solar farm applications at |  rejected, defined as planning success. Previous research | . The analyses rely on the Renewable Energy Planning |  Energy Security and Net Zero, and planning officer |  what circumstances solar farm proposals in England
关键词: Solar power |  Local planning |  Renewable energy |  Stakeholder networks |  Contextual factors |  Renewable energy planning database (REPD) |  UK

2. Distributionally robust planning for power-to- gas integrated large wind farm systems incorporating hydrogen production switch control model NSTL国家科技图书文献中心

Yeong Geon Son |  Sung Yul Kim -  《Energy》 - 2025,314(Jan.1) - 134210.1~134210.18 - 共18页 - 被引量:1

摘要: optimal planning and operation strategy is proposed for |  a large wind farm coupled with a power-to-gas |  and reduced curtailed energy from the wind farm by | To address the challenges associated with the |  variability of wind power and to optimize the use of
关键词: Wind farm |  Power to gas |  Distributionally robust optimization |  Ambiguity set |  Mixed-integer linear programming

3. Carbon stocks, technological development, and milk yields of dairy cattle silvopastoral production systems in the Andean-amazon region of Colombia NSTL国家科技图书文献中心

Mavisoy, Henry |  Rincon, Edwin Castro... -  《Agroforestry Systems》 - 2025,99(2) - 共18页

摘要: (CLB) at the farm level, technological adoption and |  farm size was 9.1 +/- 0.8 ha-1 where live fences (LF |  management, and the enhancement of SPS coverage at the farm | This research aimed to assess carbon (C | ) stocks (living biomass, soil and detritus) in
关键词: Agroforestry |  Environmental services |  Farm planning |  Live fences |  Woodlots

4. A wake-induced two-phase planning framework for offshore wind farm maintenance with stochastic mixed-integer program NSTL国家科技图书文献中心

Lee N. |  Lee H.... -  《Applied energy》 - 2025,380(Feb.15) - 1.1~1.14 - 共14页

摘要: rates, leading to suboptimal planning and increased |  comprehensive maintenance planning framework that incorporates |  these uncertainties. We formulate an annual planning |  problem. The annual planning process aims to minimize |  planning, we address weekly short-term scheduling
关键词: Maintenance scheduling |  Mixed-integer program |  Offshore wind farm |  Stochastic program |  Wake effect

5. Reliability-Based Planning of Cable Layout for Offshore Wind Farm Electrical Collector System Considering Post-Fault Network Reconfiguration NSTL国家科技图书文献中心

Xiaochi Ding |  Yunfei Du... -  《IEEE transactions on sustainable energy》 - 2025,16(1) - 419~433 - 共15页

摘要: ECS cable layout planning method for large-scale | The electrical collector system (ECS) plays a |  crucial role in determining the performance of offshore |  wind farms (OWFs). Existing research has |  predominantly restricted ECS cable layouts to conventional
关键词: Reliability |  Planning |  Layout |  Wind turbines |  Structural rings |  Costs |  Contingency management

6. Levelized cost of energy for various floating offshore wind farm designs in the areas covered by the Spanish maritime spatial planning NSTL国家科技图书文献中心

Thomas B. |  Costoya X.... -  《Applied energy》 - 2025,381(Mar.1) - 1.1~1.18 - 共18页

摘要: implementing Maritime Spatial Planning encompassing 19 | © 2024 The AuthorsSpain took a significant |  step towards achieving its goal of installing 1 to 3 |  GW of floating offshore wind capacity by 2030, by |  designated areas. Therefore, it is essential to calculate
关键词: CMIP6 projections |  Floating offshore wind turbines |  Levelized cost of energy |  Offshore wind energy |  Spanish maritime spatial planning |  WRF dynamical downscaling

7. The future of offshore wind power production: Wake and climate impacts NSTL国家科技图书文献中心

Warder S.C. |  Piggott M.D. -  《Applied energy》 - 2025,380(Feb.15) - 1.1~1.19 - 共19页

摘要: resource assessment and wind farm planning. |  in potential wind power resource at the farm |  planning stage. Such changes may arise from multiple |  due to increasingly dense farm build-out, we model |  (intra-cluster) and short-range (intra-farm) effects
关键词: Bias correction |  Climate change |  Cluster wakes |  Farm wakes |  Turbine wakes |  Wind power |  Wind shadowing

8. An investment game model for offshore power grid multi-stage expansion planning NSTL国家科技图书文献中心

Tao S. -  《Renewable energy》 - 2025,238(Jan.) - 1.1~1.13 - 共13页

摘要:© 2024The offshore power grid (OPG) which |  connects multiple neighboring coastal countries is an |  effective solution to collect and deliver electricity |  generated by offshore wind farms (OWFs). The transmission |  network investment decision of the OPG expansion tends
关键词: Net present value |  Offshore power grid |  Offshore wind farm |  Transmission system planning |  Two-stage game model

9. The nexus between connectivity, climate, and land use: A scenario assessment of bio-energy landscape connectivity in central Italy NSTL国家科技图书文献中心

Raffaele Pelorosso |  Sergio Noce... -  《Journal of Environmental Management》 - 2025,376(Mar.) - 124521.1~124521.16 - 共16页

摘要: planning to address connectivity challenges effectively |  nexus concept into comprehensive multilevel planning | The complex interplay between landscape |  connectivity, climate fluctuations, and land use |  transformations profoundly affects ecosystem health
关键词: Land use planning |  Biodiversity conservation |  Ecological modelling |  Climate change |  Urban growth |  Farm abandonment

10. Towards machine learning applications for structural load and power assessment of wind turbine: An engineering perspective NSTL国家科技图书文献中心

Wang Q. |  Yang S.... -  《Energy conversion & management》 - 2025,324(Jan.) - 1.1~1.15 - 共15页 - 被引量:1

摘要: various phases of wind farm planning and development |  maximum and fatigue thrust loads crucial for wind farm |  of power and load evaluations for wind farm design | © 2024 Elsevier LtdOver the past decades, the |  increasing energy demand has accelerated the construction
关键词: Dynamic wake meandering model (DWM) |  Fatigue analysis |  Machine learning |  Wind turbine
检索条件Farm planning
  • 检索词扩展

NSTL主题词

  • NSTL学科导航